¡¡¡¡ Xinglongzhuang Coal Mine locates in the northern of Yanzhou coalfield. It was started construction in 1975 and put into commercial production in 1981. Its main mining seam is concentrated on one stratum with average thickness of 8.29 meters and annual capacity of 3 million tones. The proven and probable reserve of the main mining seam estimated is 341 million tones in total up to 31st December, 2007. And the comprehensive mechanized top coal caving mining method mainly adopted by the Company is firstly implemented in Xinglongzhuang Coal Mine.
    Original designed capacity of Xinglongzhuang Coal Mine preparation plant is of 3Mt/a raw coal. It mainly produces No.1 clean coal and No.2 clean coal/steam coal and its main equipments are all imported from abroad, including jig machine, heavy medium cyclones and floatation cells, etc..
 
 
 
 
 
 